The correct machines hope that streak reaches the moon this week

Houston-based distance The company just released the preview of tanquising Sneak – a photo sequence of its flying robots over the monthThe South Pole, near its place planned in a fixed area.
The destination of the Mouton, one of the StewardPotential locations of the arrival of its Artemis stars. Accurate equipment‘Athena Moon Lander started rotate Month in March 3, one day after the competition, Firefly Aerospacearrived in light place without hitting.
This is a second machine amumitist trip, following its success in the past year in the To be the first business – Instead of government area program – touching the floor without severe crashing and finished the mission. But to tell the aircraft regulators that “break the leg” may not be lucky they want to hear before the Athena’s time: Although the Odysseus Lander was able to send some information in 2024, damaged one of its containers.
Recent commission, called im-2 or Prime-1T-TAKE AT MONTH ADDIC 11:32 am CT on March 6. Accurate equipment and NASA will provide The combination of live eventSince 10:30 AM Ct.
The company returns to the moon. Here’s how to avoid installing and
In this video above, Athena Lander can appear on the moon’s plane near Lunar South near its target location.
If it succeeds in finding a place, the company work will be between the first exhibition of receiving resources in the month. Drill and Mass Spectrometer, a device that identifies the types of objects or particles in something, will measure the existence of gasses on the month’s soil. Laser Retrorefple Array on the World Paper and will cover the laser light back to any incoming or incoming spacecraft. Other instruments will check the land communication system and use drone that can humble in the month.
Bright light speed
Athena is the second Lunar Payload Services for Lunar-Support Lander of the year. The NASA program invested $ 2.6 billion in contractors with independent companies to help deliver the important data.
Athena flys midline the middle of the month of the upper image.
But arriving in the moon It’s always fun. This page Monthly shortages It provides almost no dragging spacecraft down as it approaches the ground. In addition, there are no GPS programs in the month to help guide creativity in its arrival area.
A combination of gravity and inertia items appeared in the correct stemie of previous arrival. Everything in the song is “Tipier six times,” said Phil Metzger, a planet scientist at the University of Florida, and then in the middle Posts in X. Japan Moon Lander Slim, Short Smart Lander Short Month, Informed The same effect.
“Why was the Angle Degree? We know why we do,” Trent Martin, Higher President told reporters during the news conference. “There had been a problem with a laser Altimeter that used last time before arriving only the closest to how close we were on the face.”
When the correct “Odysseus Lander machines affected a month by 2024, broken gear from one of the robotic spacecraft six.
Credit: Accurate equipment
Instead of using Laser Altimeter, aircraft controllers actually used coated coated on the spacecraft board, which was less accurate, eventually a point by reaching a difficult arrival. Martin said the investigation into the spacecraft data has led to 85 development, including the joint circumstances that should allow Athena to arrive at 10 structures.
At that time, NASA tries to solve problems with another rocket spacecraft with Athena. Engineers are able to get in contact with them NASA’s Lunar Trailblazer In space the day is presented, only to lose Israel the next day, Feb. 27.
Nasa said the party was Working with Earth Stations To restart Telemetry and check the power system news to try to fix it. The space agency never gave a review to the spacecraft.